Dock leveler operation manual






















This user’s manual contains information that you need to safely install, operate and maintain the VSL model dock leveler. It also contains a complete product description and operating instructions for the VSL remote mounted and VSL deck mounted. optional ENERGY GUARD® dock leveler sealing system. This User’s Manual contains information that you need to safely install, operate and maintain the dock leveler. It also contains a complete parts list and information about ordering replacement parts. Please keep and read this User’s Manual before using your new dock leveler. The optimal installation site is a loading dock where the floor is 50 inches above the ground. If the dock is lower than 50 inches, ramps and ramp support angles are necessary. The dock face should include 6 inch, integral steel channel along the top edge of the loading dock floor. This feature allows the dock leveler and dock bumpers to.


slope of the dock leveler deck and lip when in use; frequency of use and desired life of the dock leveler. prior to using the dock leveler, or if the application conditions for the dock leveler change in any respect, contact your authorized pentalift representative to confirm the specific dock leveler’s suitability for the application. This user’s manual contains information that you need to safely install, operate and maintain the VSL model dock leveler. It also contains a complete product description and operating instructions for the VSL remote mounted and VSL deck mounted. The Blue Giant U-Series Mechanical Dock Leveler is a high performance yet easy to operate system. No manual lifting is involved: simply pull the hold-down release ring (located at the rear of the leveler) to activate the ratchet hold-down system and the deck will move.


Dec Please follow all installation and set ups steps as indicated in the installation instructions and owner's manual. If you are unclear or. The operating range compensates for small differences from the truck suspension during loading and unloading procedures. Operation: Edge of Dock Levelers are. STEP 7 Read operating instructions before completing the connection to the power pack. Operate the the leveler several times, pausing between operations to.

0コメント

  • 1000 / 1000